Home    |    Contact Us   
   -A A +A   |  

All posts by data_entry

Public Hearing as per Environmental Impact Assessment 2006 with respect to Block IX Surla Sonshi Mineral Block for mining of Iron Ore with production capacity of  1.1 MTPA, 0B/Waste 2.59 Million TPA (Total Excavation : 3.69 Million TPA) along with Installation of Wet Beneficiation Plant with throughput Capacity:1.1 MTPA over ML area of 254.51 Ha by M/s. JSW Steel Ltd. located at Villages Surla, Cudnem and Sonus Vonvoliem, Taluka; Bicholim & Sattari, District: North Goa (Goa).
Sr.No.  Project details Date Time Venue Documents
1 Public Hearing as per Environmental Impact Assessment 2006 with respect to Block IX Surla Sonshi Mineral Block for mining of Iron Ore with production capacity of  1.1 MTPA, 0B/Waste 2.59 Million TPA (Total Excavation : 3.69 Million TPA) along with Installation of Wet Beneficiation Plant with throughput Capacity:1.1 MTPA over ML area of 254.51 Ha by M/s. JSW Steel Ltd. located at Villages Surla, Cudnem and Sonus Vonvoliem, Taluka; Bicholim & Sattari, District: North Goa (Goa). 16/03/2026 10.30 am onwards Ravindra Bhavan Sankhali-Goa.

 

 Documents
Establishment of 2×300 KLPD(Phase-1:1×300 KLPD & Phase-2:1×300 KL PD)Grain based Ethanol/ELA plant & 2×7.0 MW(Phase-1:1×7.0 MW & Phase-2:1×7.0 MW) Cogeneration Power plant & Bottling plant of 870 Bottles/minute located at Navelim Industrial Area Survey Nos. 120(P),121(P) and 177(P), Navelim village, Bicholim Taluka, North Gon District, Goa by M/s Centreal Biofuels Limited – Grant of prior Environmental Clearance (EC) to the proposed project under the provision of the EIA Notification 2006 regarding.

Establishment of 2×300 KLPD(Phase-1:1×300 KLPD & Phase-2:1×300 KL PD)Grain based Ethanol/ELA plant & 2×7.0 MW(Phase-1:1×7.0 MW & Phase-2:1×7.0 MW) Cogeneration Power plant & Bottling plant of 870 Bottles/minute located at Navelim Industrial Area Survey Nos. 120(P),121(P) and 177(P), Navelim village, Bicholim Taluka, North Gon District, Goa by M/s Centreal Biofuels Limited – Grant of prior Environmental Clearance (EC) to the proposed project under the provision of the EIA Notification 2006 regarding.

Issuance of Prior Environmental Clearance (EC) to produce 0.5 MPTA of Iron Ore (Open cast mining) in Onda Mineral Block-X (Lease Area 61.7325 Ha) located at Sy No 123,124,125,126,130,132,133,134,135,136,137,138,139,140,141,143 Nallah & Road of Onda Village Sattari Taluka North Goa District, Goa with extraction capacity of 500000 Tons per Annum (TPA)

Issuance of Prior Environmental Clearance (EC) to produce 0.5 MPTA of Iron Ore (Open cast mining) in Onda Mineral Block-X (Lease Area 61.7325 Ha) located at Sy No 123,124,125,126,130,132,133,134,135,136,137,138,139,140,141,143 Nallah & Road of Onda Village Sattari Taluka North Goa District, Goa with extraction capacity of 500000 Tons per Annum (TPA)

The office of the Additional District Magistrate (North) vide their letter No.20/9/2024-MAG/Centreal Biofuels Ltd./2937 dated 16/10/2025 has scheduled the conduct of the Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Greenfield Project-2 x 300 KLPD Grain based Ethanol/ ENA Plant, 2 x 7.0 MW Co-generation Power plant to be implemented in two phases & Bottling plant of 870 Bottles/ Minute in Phase-1 [Phase -1:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant, Phase-2:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant] located at Navelim Industrial Area, Survey Nos.120 (P), 121 (P) and 177 (P), Navelim village, Bicholim Taluka, North Goa District Goa of M/s. Centreal Biofuels Limited
Project Details Date Time & Venue Downloads
The office of the Additional District Magistrate (North) vide their letter No.20/9/2024-MAG/Centreal Biofuels Ltd./2937 dated 16/10/2025 has scheduled the conduct of the Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Greenfield Project-2 x 300 KLPD Grain based Ethanol/ ENA Plant, 2 x 7.0 MW Co-generation Power plant to be implemented in two phases & Bottling plant of 870 Bottles/ Minute in Phase-1 [Phase -1:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant, Phase-2:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant] located at Navelim Industrial Area, Survey Nos.120 (P), 121 (P) and 177 (P), Navelim village, Bicholim Taluka, North Goa District Goa of M/s. Centreal Biofuels Limited 21st  November 2025 11.00 am onwards at Centreal Biofuels Limited Factory complex next to Mohit Ispat Engineering Pvt. Ltd., Navelim Industrial Area Minutes of PH