Public Hearing as per Environmental Impact Assessment 2006 with respect to Block IX Surla Sonshi Mineral Block for mining of Iron Ore with production capacity of 1.1 MTPA, 0B/Waste 2.59 Million TPA (Total Excavation : 3.69 Million TPA) along with Installation of Wet Beneficiation Plant with throughput Capacity:1.1 MTPA over ML area of 254.51 Ha by M/s. JSW Steel Ltd. located at Villages Surla, Cudnem and Sonus Vonvoliem, Taluka; Bicholim & Sattari, District: North Goa (Goa).
| Sr.No. | Project details | Date | Time | Venue | Documents |
| 1 | Public Hearing as per Environmental Impact Assessment 2006 with respect to Block IX Surla Sonshi Mineral Block for mining of Iron Ore with production capacity of 1.1 MTPA, 0B/Waste 2.59 Million TPA (Total Excavation : 3.69 Million TPA) along with Installation of Wet Beneficiation Plant with throughput Capacity:1.1 MTPA over ML area of 254.51 Ha by M/s. JSW Steel Ltd. located at Villages Surla, Cudnem and Sonus Vonvoliem, Taluka; Bicholim & Sattari, District: North Goa (Goa). | 16/03/2026 | 10.30 am onwards | Ravindra Bhavan Sankhali-Goa.
|
Documents |
The office of the Additional District Magistrate (North) vide their letter No.20/9/2024-MAG/Centreal Biofuels Ltd./2937 dated 16/10/2025 has scheduled the conduct of the Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Greenfield Project-2 x 300 KLPD Grain based Ethanol/ ENA Plant, 2 x 7.0 MW Co-generation Power plant to be implemented in two phases & Bottling plant of 870 Bottles/ Minute in Phase-1 [Phase -1:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant, Phase-2:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant] located at Navelim Industrial Area, Survey Nos.120 (P), 121 (P) and 177 (P), Navelim village, Bicholim Taluka, North Goa District Goa of M/s. Centreal Biofuels Limited
| Project Details | Date | Time & Venue | Downloads |
| The office of the Additional District Magistrate (North) vide their letter No.20/9/2024-MAG/Centreal Biofuels Ltd./2937 dated 16/10/2025 has scheduled the conduct of the Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Greenfield Project-2 x 300 KLPD Grain based Ethanol/ ENA Plant, 2 x 7.0 MW Co-generation Power plant to be implemented in two phases & Bottling plant of 870 Bottles/ Minute in Phase-1 [Phase -1:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant, Phase-2:1 x 300 KLPD Ethanol/ENA & 1 x 7.0 MW Co-generation Power Plant] located at Navelim Industrial Area, Survey Nos.120 (P), 121 (P) and 177 (P), Navelim village, Bicholim Taluka, North Goa District Goa of M/s. Centreal Biofuels Limited | 21st November 2025 | 11.00 am onwards at Centreal Biofuels Limited Factory complex next to Mohit Ispat Engineering Pvt. Ltd., Navelim Industrial Area | Minutes of PH |