DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PLAN At Village: Codli, Taluka: Dharbandora, District: South Goa (Goa). Study Period : Summer Season (March to May, 2025) With Iron Ore Production 3.50 Million TPA, OB/Waste 8.21 Million TPA (Total Excavation: 11.71 Million TPA) along with Installation 04 Crusher (3 Primary Crusher of 1 x 250 TPH & 2 x 90 TPH and 1 Secondary Crusher of 150 TPH) and 600 TPH Dry Processing/Screening Plant & 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity 3.50 Million TPA

DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PLAN At Village: Codli, Taluka: Dharbandora, District: South Goa (Goa). Study Period : Summer Season (March to May, 2025) With Iron Ore Production 3.50 Million TPA, OB/Waste 8.21 Million TPA (Total Excavation: 11.71 Million TPA) along with Installation 04 Crusher (3 Primary Crusher of 1 x 250 TPH & 2 x 90 TPH and 1 Secondary Crusher of 150 TPH) and 600 TPH Dry Processing/Screening Plant & 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity 3.50 Million TPA

Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Block – XII Codli Mineral Block with Iron Ore Production of 3.50 MTPA, OB/Waste of 8.21 MTPA (total excavation: 11.71 MTPA), along with installation of 4 Crushers (3 Primary Crushers of 1 x 250 TPH and 2 x 90 TPH, and 1 Secondary Crusher of 150 TPH) and a 600 TPH Dry Processing/Screening Plant, along with 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity of 3.50 MTPA, in the auctioned block area of 377.0881 ha by M/s. JSW Steel Limited located at Village Codli, Taluka Dharbandora, District South Goa, Goa on 22/10/2026 at 10.00 am at Shree Sateri Pisani Devasthan Kalsai, Kirlapal Dabal, Dharbandora Taluka, Kushavati District – Goa.
Project Details Date Time Venue Downloads
Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Block – XII Codli Mineral Block with Iron Ore Production of 3.50 MTPA, OB/Waste of 8.21 MTPA (total excavation: 11.71 MTPA), along with installation of 4 Crushers (3 Primary Crushers of 1 x 250 TPH and 2 x 90 TPH, and 1 Secondary Crusher of 150 TPH) and a 600 TPH Dry Processing/Screening Plant, along with 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity of 3.50 MTPA, in the auctioned block area of 377.0881 ha by M/s. JSW Steel Limited located at Village Codli, Taluka Dharbandora, District South Goa, Goa on 22/10/2026 at 10.00 am at Shree Sateri Pisani Devasthan Kalsai, Kirlapal Dabal, Dharbandora Taluka, Kushavati District – Goa. 22/10/2026 10.00 am Shree Sateri Pisani Devasthan Kalsai, Kirlapal Dabal, Dharbandora Taluka, Kushavati District – Goa Summary

 

Establishment of 2 X 300 KLPD Grain Based Ethanol/ENA plant & 2 X 7.0 MW Cogeneration Powe Plant & Bottling plant of 870 Bottles/Minute located at Navelim Industrial Area Survey Nos 120(P),121(P), 177(P) Navelim Village Bicholim Taluka North Goa District Goa by M/s Centreal Biofuels Limited- Grant of Prior Environmental Clearance (EC) to the proposed project under the provision of the EIA Notification 2006 regarding.

Establishment of 2 X 300 KLPD Grain Based Ethanol/ENA plant & 2 X 7.0 MW Cogeneration Powe Plant & Bottling plant of 870 Bottles/Minute located at Navelim Industrial Area Survey Nos 120(P),121(P), 177(P) Navelim Village Bicholim Taluka North Goa District Goa by M/s Centreal Biofuels Limited- Grant of Prior Environmental Clearance (EC) to the proposed project under the provision of the EIA Notification 2006 regarding.