Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Block – XII Codli Mineral Block with Iron Ore Production of 3.50 MTPA, OB/Waste of 8.21 MTPA (total excavation: 11.71 MTPA), along with installation of 4 Crushers (3 Primary Crushers of 1 x 250 TPH and 2 x 90 TPH, and 1 Secondary Crusher of 150 TPH) and a 600 TPH Dry Processing/Screening Plant, along with 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity of 3.50 MTPA, in the auctioned block area of 377.0881 ha by M/s. JSW Steel Limited located at Village Codli, Taluka Dharbandora, District South Goa, Goa on 22/10/2026 at 10.00 am at Shree Sateri Pisani Devasthan Kalsai, Kirlapal Dabal, Dharbandora Taluka, Kushavati District – Goa.
Project Details Date Time Venue Downloads
Environmental Public Hearing as per Environmental Impact Assessment 2006 with respect to Block – XII Codli Mineral Block with Iron Ore Production of 3.50 MTPA, OB/Waste of 8.21 MTPA (total excavation: 11.71 MTPA), along with installation of 4 Crushers (3 Primary Crushers of 1 x 250 TPH and 2 x 90 TPH, and 1 Secondary Crusher of 150 TPH) and a 600 TPH Dry Processing/Screening Plant, along with 2 x 300 TPH Wet Beneficiation Plant with Throughput Capacity of 3.50 MTPA, in the auctioned block area of 377.0881 ha by M/s. JSW Steel Limited located at Village Codli, Taluka Dharbandora, District South Goa, Goa on 22/10/2026 at 10.00 am at Shree Sateri Pisani Devasthan Kalsai, Kirlapal Dabal, Dharbandora Taluka, Kushavati District – Goa. 22/10/2026 10.00 am Shree Sateri Pisani Devasthan Kalsai, Kirlapal Dabal, Dharbandora Taluka, Kushavati District – Goa Summary